Heavy Duty Beam Falsework System Formwork System on Construction in Concrete Bridge

Product Details
Customization: Available
After-sales Service: Provide After Sale Service
Warranty: Provide After Sale Service
Still deciding? Get samples of US$ 100/Piece
Request Sample
Gold Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
R&D Capabilities
The supplier has 2 R&D engineers, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
to see all verified strength labels (27)
  • Heavy Duty Beam Falsework System Formwork System on Construction in Concrete Bridge
  • Heavy Duty Beam Falsework System Formwork System on Construction in Concrete Bridge
  • Heavy Duty Beam Falsework System Formwork System on Construction in Concrete Bridge
  • Heavy Duty Beam Falsework System Formwork System on Construction in Concrete Bridge
  • Heavy Duty Beam Falsework System Formwork System on Construction in Concrete Bridge
  • Heavy Duty Beam Falsework System Formwork System on Construction in Concrete Bridge
Find Similar Products

Basic Info.

Certification
ISO, CE
Material
Steel
Type
Beam Formwork
Steel
Q355
Finished
Hot DIP Galvanized / Painted
Scaffold Type
Formwork/Shoring
Delivery Term
45 Days
Usage
Building Material
Transport Package
Normal Package
Specification
1800MM
Trademark
OEM/ODM
Origin
China
HS Code
73084000
Production Capacity
50ton / Month

Product Description

Heavy duty beam falsework system formwork system on construction in concrete bridge
The purpose of the heavy duty Waler Beam is to be used for both horizontal and vertical shoring solutions.
It may also be used as a diagonal brace for heavy-duty shoring systems.
Its simplicity in design allows it to adapt to the most demanding challenges and environments.


Features

When utilized shoring applications, the grater loading capacities throughout the system considerably reduce the number of components required, and consequently the assembly and dismantling times.
Ten different lengths , from 3.5in(90mm)to 212.6in(3600mm),allow beams of nearly any length to be assembled
A variety of applications can be realized for large-scale projects such as gantries, shoring, structures, and heavy-duty formwork tables.
Standard accessories and clamp make it fully compatible with other component, easy to assemble/dismantle and improve work efficiency.
From tie and other components can be used anywhere, complete freedom to create the optimum design whatever the application.
Using accurate welding jigs, manufactured from high-yield steel, combining maximum durability and load capacity with reduced unit weight. Completed by hot dip galvanizing , eliminating corrosion and minimizes maintenance.
Heavy Duty Beam Falsework System Formwork System on Construction in Concrete Bridge
Applications
Waler Beam is suitable for a variety of temporary works applications such as :
  1. Facade retention
  2. Back-propping and support system
  3. Wall formwork panels
  4. Vertical, horizontal and raking propping shores
  5. Structural Propping
  6. Bridge propping and jacking support compatible
  7. Spanning beams
  8. Propping and needing systems

Dimensions
  1. Waler Beam 225
Code Description Weight
DWB2236 141.7in WB 3600MM 160.9 Ib 73.0 kg
DWB2227 106.3in WB 2700MM 121.3 Ib 55.0 kg
DWB2218 70.9in WB 1800MM 88.2 Ib 40.0 kg
DWB2212 49.6in WB 1260MM 77.2Ib 35.0 kG
DWB2209 35.4in WB 900MM 48.7 Ib 22.1 kg
DWB2207 28.3in WB 720MM 44.1Ib 20.0 kg
DWB2205 21.3in WB 540MM 35.3 Ib 16.0 kg
DWB2203 14.2in WB 360MM 27.3 Ib 12.4 kg
DWB2201 7.1in WB 180MM 24.3 Ib 11.0 kg
DWB2200 3.5in WB 90MM 21.2 Ib 9.6 kg
Heavy Duty Beam Falsework System Formwork System on Construction in Concrete Bridge
2.6 Way Connector
Code Description Weight
DWB0001 WB 6 WAY CONNECTOR 55.1 Ib 25 kg

3.Waler Beam Jacks(LH&RH)
Code Description Weight
DWB0002 WB6 WALER BEAM(LH&RH) 28.2 Ib 12.8 kg
 
  1. Anchor Plate
Code Description Weight
DWB0003 WB ANCHOR PLATE 16.3 Ib 7.4 kg
 
  1. Pivot Cleat Set
Code Description Weight
DWB0004 WB PIVOT CLEAT SET 19.4 Ib 8.8 kg
Heavy Duty Beam Falsework System Formwork System on Construction in Concrete Bridge
  1. Connecting pin& clip
Code Description Weight
DWB0005 WB Connect pin& clip 0.53 Ib 0.24 kg
 
  1. Tilt plate
Code Description Weight
DWB0006 WB TILT PLATE 13.3 Ib 6.0 kg
 
  1. Bracing Connector
Code Description Weight
DWB0007 WB BRACING CONNECTOR 4.6 Ib 2.1 kg
 
  1. Turn-Buckles
Code Description Weight
DWB0008 WB TURNBUCKLES914-1160 18.5 Ib 8.4 kg

Heavy Duty Beam Falsework System Formwork System on Construction in Concrete BridgeWaler beam welding jig Heavy Duty Beam Falsework System Formwork System on Construction in Concrete Bridge
Waler beam package and delivery

Heavy Duty Beam Falsework System Formwork System on Construction in Concrete BridgeHeavy Duty Beam Falsework System Formwork System on Construction in Concrete BridgeHeavy Duty Beam Falsework System Formwork System on Construction in Concrete Bridge
FAQ
1, What's your MOQ?
    MOQ is required for customized products(30 ton)
2, What's your payment terms?
    30% deposit, balance before delivery.
3, What's your delivery time?
    It depends on products, 45days to 70days after confirmed the order
4, Where is your factory?
    Our company is located in Taishan,Guangdong. Two hours to Guangzhou, shenzhen, four hours to Hongkong.
5, Can we visit your factory?
    Of course! Also we can help you to arrange airport pick up and hotel booking.


Waler beam Project 
Heavy Duty Beam Falsework System Formwork System on Construction in Concrete BridgeHeavy Duty Beam Falsework System Formwork System on Construction in Concrete Bridge

Factory 
Located in Guangdong, the factory cover an area of 16,528 M2 and is specialized in the production of shoring and safety systems.
The factory is also equiped with modern and high-performance production tools and is ISO 9001 certified.
Heavy Duty Beam Falsework System Formwork System on Construction in Concrete Bridge
Products including shoring system, scaffolding system, formwork system, and other components for construction site. 
And products are exported to Japan, the United States, Canada, Germany, Spain and many other countries.Heavy Duty Beam Falsework System Formwork System on Construction in Concrete Bridge
With ISO9001 and other qualifications, professional R&D and QC team can guanantee the quantity of products.
DKS aims to ensure safety in every work site alsong with its mission to bring happiness to its employees and contribute to society.
DKS adhere to the management principles of "quality first, ccustomer first and credit based" since the establishment of the company and always do our best to satisfy potential needs of our customers. DKS is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier