• ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork Construction
  • ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork Construction
  • ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork Construction
  • ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork Construction
  • ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork Construction
  • ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork Construction

ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork Construction

After-sales Service: Provide After Sale Service
Warranty: Provide After Sale Service
Certification: ISO
Material: Steel
Type: Beam Formwork
Certificated: ISO9001
Samples:
US$ 100/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company
Gold Member Since 2021

Suppliers with verified business licenses

Guangdong, China
to see all verified strength labels (27)

Basic Info.

Model NO.
DMB900
Steel
Q235/Q355
Finished
HDG/Painted
Container
FCL/LCL
Transport Package
Normal Package
Specification
900MM
Trademark
OEM/ODM
Origin
China
HS Code
73084000
Production Capacity
500 Ton / Month

Product Description

ISO9001 scaffolding Shoring steel Megabeam prop system formwork construction


Mega beam is a versatile temporary modular heavy-duty propping system that can be adapted to the most demanding projects on construction sites. Its most frequent uses are the support of bridges, superstructures and ground shoring applications.
It is one of the fastest, most efficient and versatile ways to provide quick support and access solutions in a wide variety of situations, using only two main components, the base jack and heavy-duty mega beam. This comes complete with a variety of additional propping and shoring equipment.
ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork Construction
Features & Benefits
Nine standard lengths, from 3.5in(90mm) to 212.6in (5400mm), with a board choice of accessories. Mega beam can be assembled into towers, props and beams of nearly any length.
1000kN massive axial load capacity and high axial stiffness. Mega beam can be adapted to the demands of heavy formwork, cofferdams, bridge decks and more.
Mega beam 1000 can be used as the backbone of the bridge with minimal traffic flow disruption.
Using accurate welding jigs, manufactured from high-yield, combining maximum durability and load capacity with reduced unit weight, complete by hot dip galvanizing, eliminates corrosion and minimizes maintenance.
The Mega beam system is engineered to minimize labor costs, increase site productivity, improve work site safety and meet the requirements of current construction and civil engineering techniques.
Mega beam must always be used by experienced personnel and have multi-directional support.
ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork Construction
Applications
Mega beam temporary sections, which are robust and easy to assemble, can be used in many temporary work applications such as:
Cofferdams
Bridge propping and hydraulic jacking
Façade retention
Ground shoring and excavation support
Construction of lifting rigs
When used in conjunction with Waler beam or soldiers stadium roof supports
Travelling slab and tunnel formwork
Heavy duty falsework
ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork Construction
1 DKS Mega Beam 1000
Code Description Weight
DMB5400 212.6in MB leg 5400mm 696.7lb 316.0kg
DMB4500 177.2in MB leg 4500mm 586.4lb 266.0kg
DMB2700 106.3in MB leg 2700mm 352.7lb 160.0kg
DMB1800 70.9in MB leg 1800mm 246.9lb 112.0kg
DMB0900 35.4in MB leg 900mm 143.3lb 65.0kg
DMB0450 17.7in MB leg 450mm 99.2lb 45.0kg
DMB0270 10.6in MB leg 270mm 77.2lb 35.0kg
DMB0090 3.5in MB leg 90mm 55.1lb 25.0kg
DMB0015 0.6in MB leg 15mm E/P 22.0lb 10.0kg
 
 
 
ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork Construction
 


2. Screw Jack
Code Description Weight
DMB1000 Screw Jack 119.1lb 54.02kg

 

3. Rocking Head
Code Description Weight
DMB03 Rocking Head 103.6lb 47.0kg


4. Jack Plate
Code Description Weight
DMB01 Jack Plate 44.8lb 20.3kg


5. Brace Plate
Code Description Weight
DMB02 Brace Plate 44.1lb 20.0kg
ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork Construction
 

Mega beam welding Jig 
 
ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork Construction
 
ISO Certificate
ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork Construction

Factory 
DKS was established in 2005, located in Taishan, Guangdong Province, with convenient transportation and only two hours from Guangzhou.
DKS is committed to the production and marketing of scaffolding system, shoring system and formwork system including steel ringlock system, Mega beam, waler beam, shoring jack and others, Also other aluminum scaffolding products.
The factory is also equiped with modern and high-performance production tools and is ISO 9001 certified.
ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork Construction
Products including shoring system, scaffolding system, formwork system, and other components for construction site. 
And products are exported to Japan, the United States, Canada, Germany, Spain and many other countries.
ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork ConstructionISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork ConstructionWith ISO9001 and other qualifications, professional R&D and QC team can guanantee the quantity of products.
With 15 years of export experience in scaffolding production, DKS products are exported to the United States,USA, Australia, Germany, Japan, Spain and many other countries.
DKS aims to ensure safety in every work site alsong with its mission to bring happiness to its employees and contribute to society.
DKS adhere to the management principles of "quality first, ccustomer first and credit based" since the establishment of the company and always do our best to satisfy potential needs of our customers. DKS is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.ISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork ConstructionISO9001 Scaffolding Shoring Steel Megabeam Prop System Formwork ConstructionFAQ
1. What's your MOQ?
    MOQ is required for customized products(30 ton)
2. What's your payment terms?
    30% deposit, balance before delivery.
3. What's your delivery time?
    It depends on products, 45days to 70days after confirmed the order
4. Where is your factory?
    Our company is located in Taishan,Guangdong. Two hours to Guangzhou, shenzhen, four hours to Hongkong.
5. Can we visit your factory?
    Of course! Also we can help you to arrange airport pick up and hotel booking.
6. Can you accept OEM/ODM? 
    Yes, of course!


https://dksglobal.en.made-in-china.com/product-list-1.html

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2021

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Management System Certification
ISO9001:2015
OEM/ODM Availability
Yes